Works for the construction of a new hydroelectric power plant
The support of the underlying excavation must be created by injection.
- Excavations and foundation excavation.
- Reinforced concrete work.
- Finishing work (walls, plastering, carpentry, metalwork, false ceilings, floors, plumbing).
- Sealing works turbines.
- Metal bridge demolition and construction of new reinforced concrete bridge.
State |
Completato |
Start Date |
27/07/2009 |
End Date |
30/11/2011 |
Client |
ENEL S.p.A. |
Planning Company |
Enel S.p.A. |
Country |
Italy |
Contract |
Construction of the power station and annexed works connected to the hydroelectric power plant of Bardonecchia |
Work Type |
SOA "OG1" |