• Login
  • Register
  • ABOUT US
    • History
    • Mission and Values
    • Company
    • Code of Ethics
    • Sostenibilità aziendale
    • Politica Aziendale GDPR
    • Documents
    • References
  • SECTORS
    • Civil and industrial buildings
    • Road Works
    • Railways works
    • Dams and Hydraulic Structures
    • Foundation and Ground Consolidation
  • WORKS
    • Civil and industiral building
    • Road Works
    • Railways Works
    • Foundations and Consolidation
    • Dams and Hydraulic Structures
  • CERTIFICATIONS
    • Professional Qualifications
    • Quality, environment, safety
    • Other Certificates
  • CONTACT
    • Where we are
    • Branch Offices
  • WORK WITH US
  • ABOUT US
    • History
    • Mission and Values
    • Company
    • Code of Ethics
    • Sostenibilità aziendale
    • Politica Aziendale GDPR
    • Documents
    • References
  • SECTORS
    • Civil and industrial buildings
    • Road Works
    • Railways works
    • Dams and Hydraulic Structures
    • Foundation and Ground Consolidation
  • WORKS
    • Civil and industiral building
    • Road Works
    • Railways Works
    • Foundations and Consolidation
    • Dams and Hydraulic Structures
  • CERTIFICATIONS
    • Professional Qualifications
    • Quality, environment, safety
    • Other Certificates
  • CONTACT
    • Where we are
    • Branch Offices
  • WORK WITH US
  • Login
  • Register

Works

Works
  • Civil and industiral building
  • Road Works
  • Railways Works
  • Foundations and Consolidation
  • Dams and Hydraulic Structures

Works

  • Civil and industiral building
  • Road Works
  • Railways Works
  • Foundations and Consolidation
  • Dams and Hydraulic Structures

Advanced filters

Country

Sector

Type of structure

Type of work


Bardonecchia Power Plant

Construction of civil engineering and appendices within the hydroelectric plant of Bardonecchia (Turin).

Construction of the power plant in Algeciras

Construction of the power plant in Algeciras, Spain

Thermal power plant at Vojany (Slovakia)

Demolition and reconstruction of pedestal for turbo generator TG15 supporting the turbine at the thermal power station of Vojany (Slovakia)

Thermal power plant at Marcinelle, Belgium

Civil engineering works for thermal power plant at Marcinelle, Belgium

New power station at Mori, Trento

Civil construction works aimed at determining the Minimum Vital Flow (Deflusso Minimo Vitale or DMV) for the new reservoir at Mori power station, near Trento.

New Covered Coal Store at Cerano

Construction of new covered coal store – Main civil works at the “Brindisi Sud” power station

Cernobbio Tunnel

Structural works for safety enhancement of the “Cernobbio” tunnel through the construction of a new ventilation suspended ceiling and compliance of existing escape route.

Lake Maggiore

Road repairing works regarding support works and protections between km 29+000 and km 39+000 of the street S.S. 34 Lago Maggiore

Dosso di Taverne Tunnel

Dosso Di Taverne Tunnel: civil engineering works inside the tunnel and at the tunnel months

Galleria Tindari

Interventi per la messa in sicurezza della galleria “TINDARI”, sia monte che valle, della tratta ME‐PA, riguardanti il consolidamento delle pareti e delle calotte e la riqualificazione ed adeguamento degli impianti tecnologici alla normativa vigente: impianti di ventilazione, illuminazione, antincendio e gestione automatizzata della galleria.

Capo d'Orlando

Interventi per la messa in sicurezza della galleria “CAPO D’ORLANDO”, sia monte che valle, della tratta ME‐PA, riguardanti il consolidamento delle pareti e delle calotte e la riqualificazione ed adeguamento degli impianti tecnologici alla normativa vigente: impianti di ventilazione, illuminazione, antincendio e gestione automatizzata della galleria.

Monte Olimpino Tunnel

Development of drawings, measurements, etc. and execution of works for the reactivation of the Monte Olimpino Tunnel 2 between km 3+258 and 4+053 along the Milano – Chiasso railway line.

Mendrisio – Stabio Railway Line

New Mendrisio-Stabio railway line, n° 634, km 0.745 – km 6.549 (sections B, C and D)

Pieve Emanuele Train Stop

Execution of works for the creation of the train station stop at Pieve Emanuele at km 10+835 along the Milano – Genova railway line.

A.Q. Lotto Nord

Progettazione esecutiva ed esecuzione lavori di adeguamento sagoma P/C 80 della linea ferroviaria Milano – Chiasso, tratto Seregno – Chiasso (Lotto Nord)

Albula Tunnel

Construction of new Albula Tunnel II - Plot 103: preliminary Albula Tunnel I + plot 103a: broadening of dugout

Lotto Unico, Torino

Accordo Quadro per l’Esecuzione dei lavori per la manutenzione delle opere civili nelle Gallerie di giurisdizione della Direzione Territoriale Produzione di Torino – Lotto Unico.

Dam of Valsoera at Ocarna (Turin)

Preservative maintenance on the dam of Valsoera in the town of Ocarna (Turin, Italy)

Dam of Lake Colombo (Bergamo)

Sardegnana Hydroelectric power plant – Dam of Lake Colombo (Bergamo): Structural and preservative renovation works

Dam of Chiotas (Cuneo)

Maintenance of upstream side of the dam of Chiotas near the hydropower plant of Entracque (Cuneo)

Saretto Dam at Acceglio (Cuneo)

Redevelopment works for the Dam of Saretto, in the town of Acceglio (Cuneo)

Dam of Rimasco – Fervento Power Plant (Vicenza)

Civil and mechanical engineering works for the construction of a new subsidiary spillway at the dam of Rimasco – Fervento power plant (Vicenza)

Sorio Power Plant (Verona)

Civil engineering works to the Santa Caterina inlet, Sorio Vecchia power station and the Sorio discharge mouths in the hydroelectric power plant of Sorio (Verona)

Restoration and Securing of Panperduto Dams

Preservative restoration and safety of dams of the Panperduto (19th century) – second plot, first excerpt.

Dam of Ceresole Reale

Preservative maintenance of the dam of Lake Serrù in the town of Ceresole Reale (Turin

Water Mains Consumer Supply Line at Fossano

Works for the development of the water mains supply line for the city of Fossano (Cuneo).

Redoing of Villoresi Canal

Redoing of crests and bottom of main intake pipe Villoresi in the towns of Lainate (Milan) and Garbagnate Milanese (Milan)

Hydro-geological Redevelopment at San Mango

Completion and hydro-geological redevelopment works at “Vallone Costa Montagna”.

Stability Works at Bardonecchia

Stability works for debris flow deposition on the Rho river in the town of Bardonecchia

Gallicano Hydro Power Plant

Civil engineering works regarding the dam and the power tunnel for the hydroelectric power plant at Gallicano (Lucca)

Gerola Hydro Power Plant

Hydroelectric power plant at Gerola – Dam of Pescegallo: restoration of dam with con recovery of water sealing, adjustment of freeboard, strengthening of emergency spillway and replacement of bottom spillway valves

Renovation of Perreres Power Plant

Execution of renewal works to the waterworks gallery and surge tanks of the power plant at Perreres (Aosta)

Venamartello Power Plant

Grading and earthworks for the intake and reservoir of the hydro power plant of Venamartello

San Giuliano Milanese

Municipality of San Giuliano Milanese – “Public Works”

Rusià Power Plant

Civil engineering works for the redoing of the diverting channel of the Rusià power plant.

Strengthening and Redevelopment of Paradiso Reservoir

Construction of by-pass, strengthening of the gallery and redevelopment and dredging of Paradiso Reservoir –Bardonecchia Power Plant.

Removal of Anchoring Block at Perreres Power Plant

Execution of works for the removal of anchoring block at vertex n° 15 of the penstock of the hydroelectric power plant of Perreres (AO).

Waterproofing of Dam of Saretto

Waterproofing works on right crest of the Dam of Saretto for the Hydroelectric Power Station of Acceglio (CN)

Power Plant of Champagne

Supply and laying of new pressure pipeline for the hydroelectric power plant of Champagne 2 (including working drawings, measurements, etc), hamlet Champagne – 11018 ; Villeneuve (AO)

Redevelopment of Power Plant of Champagne II

Redevelopment works on the structures of the diverting canal of the hydroelectric power plant of “Champagne II” covering the areas of the towns of La Salle, Avise, Arvier and Introd (AO).

Construction of Drainage Canal of Algeciras Power Station

Construction of drainage canal for power station Algeciras – Spain.

Strengthening Works on the Andonno Power Plant

Works for the application of metal covering, waterproofing and strengthening of surfaces of the pressure pipelines of the power station at Andonno (Cuneo).

Lavori di adduzione dell’invaso sul Torrente Menta

Lavori di adduzione dell’invaso sul Torrente Menta 1° Lotto: realizzazione opera di presa e galleria di derivazione

Renovation of Bard Power Plant

Renovation of barrage of the intake structure of the hydroelectric power plant of Bard: strengthening of the masonry constructions and replacement of floodgates

Redoing and Strengthening of Rusià Plant

Execution of works regarding the redoing, strengthening and maintenance of the existing channel sections for the generation of hydroelectric power of the power station at Rusià at Ceres.

Redoing of Supply Tunnel of Troina Power Plant

Redoing of supply tunnel and reservoir of Ancipa inside the Troina power plant (Enna)

Redoing of Troina-Grottafumata Tunnel

Redoing of free surface diversion channel in the Troina-Grottafumata tunnel section at the hydroelectric power station at Troina.

Sparone Power Plant

Hydroelectric power plant at Sparone: civil engineering and strengthening works for supply facilities and accessory works.

Maintenance and Strengthening of Fabbriche Power Plant

Maintenance and strengthening works for the diversion tunnel between Sillano 2 and Gramolazzo at the hydroelectric power plant of Fabbriche – town of Vagli di Sotto (Lucca)

Redevelopment of the Regalbuto – Grottafumata Tunnel

Execution of redevelopment works on the pressure tunnel and of the free-surface diversion tunnel Regalbuto - Grottafumata for the hydroelectric power plant of Contrasto

Reconditioning of Hydraulic Structures at the Power Stations in Udine

Reconditioning of Hydraulic Structures at the Hydroelectric Power Stations in Udine .

Naturno Power Station

Creation of road for vehicle entrance in Vallarga, resin grouting, hydro-scarification and plastering of inlet tunnel walls of the hydroelectric power station of Naturno.

Maintenance on Diverting Canal of the Saint Clair Power Station

Maintenance on the diverting canal of the power station of Saint Clair in the towns of Chambave and Pontey between 0.000 – 3500 and 7000 – 10500.

Renovation of Weir at the Hone Power Plant

ovation of the weir for the intake works at the hydroelectric power plant of Hone consisting in the consolidation of masonry work and in the replacement of the gates.

Civil Engineering Works at Traponzo Power Station

Civil engineering works for the consolidation of intake facilities and accessory work on the power plant of Traponzo (Viterbo)

Maintenance of Power Plants of Roccavione and Borgo San Dalmazzo

Extraordinary maintenance of diverting canal for the power plants of Roccavione and Borgo San Dalmazzo (first stage systems). Contract n. 5700008032 dated 04/06/2012

Completion Works at the Pian Sulè Diverting Cannel

Fixing of subsidiary intakes and completion works along the diverting canal Pian Sulè – Monte Basso – Hydroelectric power plant of Crot.

Urgent Works at the Dam of Ponte Felice

Urgent works on the banks upstream the dam of Ponte Felice at the hydroelectric power plant of Ponte Felice.

Restoration of Dams of Panperduto

Preservative restoration and securing of the Dames of Panperduto (19th cent.): 2nd Plot – First excerpt.

Demolition and Reconstruction of Campagnola Power Plant

Civil engineering works for the demolition and reconstruction of the hydroelectric power station of Campagnola near Udine.

Renovation of Coscile Power Plant

Renovation of hydroelectric 1st stage power plant at Coscile

Civil Engineering Works at Termini Imerese Power Station

Execution of civil engineering works for the doubling of the combined cycle on the former section 5 of the Thermal Power Station at Termini Imerese (Palermo)

Civil Engineering Works at the Hydroelectric Power Plant at Crevola Toce

Execution of civil engineering works of the first phase to the headpond and entrance road to the power station and to the marine deposit area inside the hydroelectric power station at Crevola Toce (Crevoladossola, Verbano)

Improvement Works of Costa Morena Pier

Works to improve the quay at Costa Morena – Drainage works at quayside – Contracted works regarded the redoing of the surface water drainage system with sealing of joints between caissons.

Works at Riese Pio X e Altivole

Works for the construction of the sewer system - Batch 2nd plot in the town of Riese Pio X e Altivole (Treviso)

Works in the City of Ravenna

Works to the main sewer, south of the purifier plants (Castiglione S. Stefano) 4th intervention in the localities of Carraie – S. Pietro in Campo – Ravenna.

Civil Works at Doiras Power Station

Execution of civil works regarding the entrance road to the valve chamber and the diversion canal at the hydroelectric power station of Doiras – Spain.

Works to the Power Plant of Gressoney-La-Trinité

Works for the foundations required for the installation of two power transformers to be set inside the area of the Gressoney-La-Trinité Power Plant

Civil Works at the Federico II Power Station

Nuovo Parco Carbone Coperto: Opere civili relative alla costruzione torre T21 di smistamento dei nastri trasporto carbone da e per i Dome B-C .

Construction and Demolition Works at the Federico II Power Station

New covered coal store: execution of civil works inside Domes B-C, foundation works, miscellaneous work, pipe-rack structures, sewer works, ground network and demolition work in the area outside the Domes, as well as works regarding the construction of the emergency hopper in Area 262.

Extraordinary Maintenance of Torino-Lione Railway Line

Extraordinary maintenance works for the adjustment of the profile B1 of the Turin-Lyon railway line along the S.Paolo, Salbentrant section

Redoing and Strengthening of Belbo Railway Tunnel

Planning and execution of works for the redoing and consolidation of sections of the Belbo railway tunnel between km 32+889 and 37+273 of the Savona – Carmagnola line (Cuneo)

Planning and Execution of Works at the Bagheria Train Station

Planning and execution of works required to extend the pedestrian underpass, stairs and ramp for disabled users, shelters and new pavements in the station of Bagheria along the Palermo – Fiumetorto line.

Construction of Underpass and Ramps for Bari - Lecce Railway Line

Construction of underpass for pedestrians and connection ramps to the existing roads at km 649+215, replacing the level crossing at km 649+234 of the Bari – Lecce railway line in Bari.

Maintenance of Railway Buildings and Fixtures in Ancona

Planning and execution of works and provision of maintenance services regarding the buildings and fixtures relating to railroad constructions (pavements, underpasses) within the “Ancona Framework Agreement”.

Strengthening of Bricchetto Railway Tunnel

Planning and execution of works urgently required to strengthen the cladding of the Bricchetto railway tunnel.

Structural Restoration of Tunnels in the Town of Prali

Structural restoration and preservation works for the tourist-cultural enhancement of the Gianna tunnel in the section heading to Salza di Pinerolo and of the inert matter silo at the Paola tunnel in the town of Prali.

Strengthening of the Tracoccia and Sciannina Tunnels

Messina – Palermo Motorway: redoing and consolidation of the cladding for the Tracoccia and Sciannina tunnels

Structural Restoration of Mongiove Tunnel

Urgent works for the civil and structural restoration of the Mongiove tunnel on motorway A20 towards Palermo.

Impresa Luigi Notari is a public company limited by shares (S.p.A.) since 1986 and holds the following certificates: UNI EN ISO 9001:2015, BS OHSAS 18001:2007 and UNI EN ISO 14001:2015 issued by ICMQ

CONTACT DETAILS
VIA FELICE CASATI, 44
20124 Milan - ITALY
PHONE: 02.66.71.29.23 r.a.
FAX: 02.66.90.925
impresa.luiginotari@impresaluiginotari.com

© 2019 IMPRESA LUIGI NOTARI spa - PIVA: 08099180153

Restricted Area

You must be registered
to download the PDF datasheet

Forgot your password?

Not registered yet? Register

Register

Enter your email address and you will receive information on how to complete your registration

Password recovery

To receive your password please enter the email address provided during the registration process