• Login
  • Register
  • ABOUT US
    • History
    • Mission and Values
    • Company
    • Code of Ethics
    • Sostenibilità aziendale
    • Politica Aziendale GDPR
    • Documents
    • References
  • SECTORS
    • Civil and industrial buildings
    • Road Works
    • Railways works
    • Dams and Hydraulic Structures
    • Foundation and Ground Consolidation
  • WORKS
    • Civil and industiral building
    • Road Works
    • Railways Works
    • Foundations and Consolidation
    • Dams and Hydraulic Structures
  • CERTIFICATIONS
    • Professional Qualifications
    • Quality, environment, safety
    • Other Certificates
  • CONTACT
    • Where we are
    • Branch Offices
  • WORK WITH US
  • ABOUT US
    • History
    • Mission and Values
    • Company
    • Code of Ethics
    • Sostenibilità aziendale
    • Politica Aziendale GDPR
    • Documents
    • References
  • SECTORS
    • Civil and industrial buildings
    • Road Works
    • Railways works
    • Dams and Hydraulic Structures
    • Foundation and Ground Consolidation
  • WORKS
    • Civil and industiral building
    • Road Works
    • Railways Works
    • Foundations and Consolidation
    • Dams and Hydraulic Structures
  • CERTIFICATIONS
    • Professional Qualifications
    • Quality, environment, safety
    • Other Certificates
  • CONTACT
    • Where we are
    • Branch Offices
  • WORK WITH US
  • Login
  • Register
Back

Mendrisio – Stabio Railway Line

Works - Works

Mendrisio – Stabio Railway Line

Client:

Swiss Federal Railways (FFS)

Sector:

Works
Railways Works

generate pdf datasheet
download pdf
  • Description
  • Technical datasheet
New Mendrisio-Stabio railway line, n° 634, km 0.745 – km 6.549 (sections B, C and D)

MAIN WORKS:

Works regarded the new “FMV” railway line that will connect the Gottardo line (south to the Mendrisio train station) to the Varese-Porto Ceresio line. To this end, it was necessary to adjust the existing section and build the new part of the new section (in Switzerland).

The works carried out included the construction of the electrified railway track, starting from the branching of the Gottardo line (km 0.745) to the borders situated at km 6.549 in Gaggiolo, in the town of Stabio.

Works included:
- Execution of the railway rolling stock including substructure, asphalt platform and pre-ballasting;
- Execution of various constructions, foundations for piles of the contact line and signals
- Construction of bridges over rivers Laveggio and Gaggiolo;
- Construction of under-crossings Gerette, S.Margherita and Nodo Puntasei and road works and related accessory works.

Main measurements:
- excavations: 163000 cub.m
- backfilling: 45000 cub.m
- substructure: 32000 cub.m
- concrete: 23500 cub.m
- reinforcing steel: 2000 t
- pre-compression cables: 1650 m
- retaining walks: 1500 sqm
- sheet piling: 8600 sqm
- waterproofing: 3500 sqm
- bituminous flooring: 19000 t
State Completato
Start Date 22/08/2011
End Date 30/09/2015
Client Swiss Federal Railways (FFS)
Planning Company Consorzio MEGA-ferr 2 Tel. 091 752 22 23
Country SWITZERLAND, CH
Name and Composition of Consortium Consorzio SANOBA: Claudio Salini S.p.A. (agent) - Impresa Luigi Notari S.p.A. (principal) - Ugo Bassi SA (principal)
Notari's Percentage Share 30%
Contract New Mendrisio-Stabio railway line, n° 634, km 0.745 – km 6.549 (sections B, C and D)
Work Type SOA "OG3"

Description

New Mendrisio-Stabio railway line, n° 634, km 0.745 – km 6.549 (sections B, C and D)

MAIN WORKS:

Works regarded the new “FMV” railway line that will connect the Gottardo line (south to the Mendrisio train station) to the Varese-Porto Ceresio line. To this end, it was necessary to adjust the existing section and build the new part of the new section (in Switzerland).

The works carried out included the construction of the electrified railway track, starting from the branching of the Gottardo line (km 0.745) to the borders situated at km 6.549 in Gaggiolo, in the town of Stabio.

Works included:
- Execution of the railway rolling stock including substructure, asphalt platform and pre-ballasting;
- Execution of various constructions, foundations for piles of the contact line and signals
- Construction of bridges over rivers Laveggio and Gaggiolo;
- Construction of under-crossings Gerette, S.Margherita and Nodo Puntasei and road works and related accessory works.

Main measurements:
- excavations: 163000 cub.m
- backfilling: 45000 cub.m
- substructure: 32000 cub.m
- concrete: 23500 cub.m
- reinforcing steel: 2000 t
- pre-compression cables: 1650 m
- retaining walks: 1500 sqm
- sheet piling: 8600 sqm
- waterproofing: 3500 sqm
- bituminous flooring: 19000 t

Technical datasheet

State Completato
Start Date 22/08/2011
End Date 30/09/2015
Client Swiss Federal Railways (FFS)
Planning Company Consorzio MEGA-ferr 2 Tel. 091 752 22 23
Country SWITZERLAND, CH
Name and Composition of Consortium Consorzio SANOBA: Claudio Salini S.p.A. (agent) - Impresa Luigi Notari S.p.A. (principal) - Ugo Bassi SA (principal)
Notari's Percentage Share 30%
Contract New Mendrisio-Stabio railway line, n° 634, km 0.745 – km 6.549 (sections B, C and D)
Work Type SOA "OG3"

Note

generate pdf datasheet
download pdf

Impresa Luigi Notari is a public company limited by shares (S.p.A.) since 1986 and holds the following certificates: UNI EN ISO 9001:2015, BS OHSAS 18001:2007 and UNI EN ISO 14001:2015 issued by ICMQ

CONTACT DETAILS
VIA FELICE CASATI, 44
20124 Milan - ITALY
PHONE: 02.66.71.29.23 r.a.
FAX: 02.66.90.925
impresa.luiginotari@impresaluiginotari.com

© 2019 IMPRESA LUIGI NOTARI spa - PIVA: 08099180153

Restricted Area

You must be registered
to download the PDF datasheet

Forgot your password?

Not registered yet? Register

Register

Enter your email address and you will receive information on how to complete your registration

Password recovery

To receive your password please enter the email address provided during the registration process