Fixing of subsidiary intakes and completion works along the diverting canal Pian Sulè – Monte Basso – Hydroelectric power plant of Crot.
MAIN WORKS:
- Excavation, demolition and earthworks
- Metal structural works
- Structures in reinforced concrete and concrete
- Drilling and injections
- Construction of micro-piles
State |
Completato |
Start Date |
18/06/2013 |
End Date |
23/10/2013 |
Client |
Enel Produzione S.p.A. – UBH Piemonte |
Planning Company |
Enel Produzione S.p.A. – UBH Piemonte |
Country |
ITALY, IT |
Contract |
Fixing of subsidiary intakes and completion works along the diverting canal Pian Sulè – Monte Basso – Hydroelectric power plant of Crot |
Work Type |
SOA “OG1” |