Supply and laying of new pressure pipeline for the hydroelectric power plant of Champagne 2 (including working drawings, measurements, etc), hamlet Champagne – 11018 ; Villeneuve (AO)
MAIN WORKS:
- Demolition and removal of existing pressure pipeline
- Supply and laying of new pressure pipeline with diam. 2000 mm
- Execution of civil engineering works (support saddles, anchor blocks), strengthening works and anchor blocks
- Demolition and reconstruction of upstream mouth and station entrance
- Environmental restoration
| State |
Completato |
| Start Date |
09/01/2007 |
| End Date |
26/10/2009 |
| Client |
C.V.A. S.p.A. Via Stazione n. 31 - 11024 Châtillon (Aosta) |
| Planning Company |
Camuna Installazioni S.r.l. |
| Country |
ITALY, IT |
| Name and Composition of Consortium |
ATI Camuna Installazioni S.r.l. - Impresa Luigi Notari S.p.A. |
| Notari's Percentage Share |
40 % |
| Contract |
Supply and laying of new pressure pipeline for the hydroelectric power plant of Champagne 2 (including working drawings, measurements, etc), hamlet Champagne – 11018 ; Villeneuve (AO) |
| Work Type |
SOA “OG6” |