Stability works for debris flow deposition on the Rho river in the town of Bardonecchia.
MAIN WORKS:
- Formation of rises in reinforced earth and of dams in pre-fabricated joints
- Construction of concrete block barrage
- Demolition and reconstruction of bridge in steel and first-class concrete
- Consolidation of bridge foundations and abutment
- Construction of new bridge in steel /reinforced concrete for vehicle traffic with cycle lane
State |
Completato |
Start Date |
12/09/2002 |
End Date |
29/10/2004 |
Client |
Municipality of Bardonecchia – Uff. Tec. LL.PP. (Turin) |
Planning Company |
Polithema Studio Associato |
Country |
ITALY, IT |
Contract |
Stability works for debris flow deposition on the Rho river in the town of Bardonecchia |
Work Type |
SOA “OG8” |