Works to improve the quay at Costa Morena – Drainage works at quayside – Contracted works regarded the redoing of the surface water drainage system with sealing of joints between caissons.
MAIN WORKS:
Earthworks, road construction, asphalts, kerbs and pavements, installation of binders and wearing surface for the redoing of the quay, installation of micro-piles, installation of metal structures, construction of structures in reinforced concrete, disposal of construction material, supply and installation of fenders, sealing of joints between caissons.
State |
Completato |
Start Date |
01/08/2012 |
End Date |
30/04/2014 |
Client |
ENEL INGEGNERIA E RICERCA S.p.A. |
Planning Company |
Enel Ingegneria e Ricerca S.p.A. |
Country |
ITALY, IT |
Contract |
Works to improve the quay at Costa Morena – Drainage works at quayside – Contracted works regarded the redoing of the surface water drainage system with sealing of joints between caissons – C006 Contract: 8400053306 dated 05/04/2012 |
Work Type |
SOA “OG1” |