Main works:
- Building gas turbines reinforced concrete foundations, floor slab, cable trenches, pipes, buried underground, finish, etc.
- Generator building: reinforced concrete foundations, floor slab, cable trenches, pipes, buried underground, finish, etc.
- Foundations for the steel construction for the rack.
- Foundation for turbine flue gas exhaust and HRSG
- Small foundations for structures of steel structures such as railings, stairs, ramps, hood, roof bridges, pipes, brackets, etc.
- Retention ponds and wells concrete.
- Walls and foundations firewall zones transformers.
- Earthworks, demolition beams and transfer of materials to landfill.
- Finishing civil works for doors and windows.
- Sewerage and sanitation.
- Underground work (drainage, plumbing, electrical tubing.
- Installation of HDPE pipe and accessories provided by ENEL (driving fire main with fire hydrants, valves, fittings and HDPE pipes for raw water and industrial use)
- Electrical grounding.
State |
Completato |
Start Date |
28/01/2008 |
End Date |
23/01/2012 |
Client |
Enel Ingegneria e Innovazione S.p.A. Via G. Carducci n. 1/3 - 20123 Milan |
Planning Company |
Enel S.p.A. |
Country |
SPAIN, ES |
Contract |
Construction of power plant of Algeciras - Spain |
Work Type |
SOA "OG1" |