Renovation of hydroelectric 1st stage power plant at Coscile
MAIN WORKS:
• Civil engineering works for the restoration and renovation of the main building
• Adjustment works for the headpond, surge tank and pressure pipe
• Redevelopment of diversion canal
• Demolition of basements of power station and related reconstruction in of structures in reinforced concrete cu m..600
• Redevelopment of damaged surfaces of headpond sqm 5000
• Redevelopment of damaged surfaces of the diversion tunnel sqm.2000
• Redevelopment of damaged surfaces of the piezometric tower cu m.1100
• Cleaning of headpond cu m.1800
State |
Completato |
Start Date |
01/07/2015 |
End Date |
01/03/2016 |
Client |
ENEL GREEN POWER S.p.A. |
Planning Company |
ENEL GREEN POWER S.p.A. |
Country |
ITALY, IT |
Contract |
Renovation of hydroelectric 1st stage power plant at Coscile |
Work Type |
SOA “OG1” |