Execution of works regarding the redoing, strengthening and maintenance of the existing channel sections for the generation of hydroelectric power of the power station at Rusià at Ceres.
MAIN WORKS:
- Demolition and removal of existing structures
- Strengthening works in the gallery and outdoors
- Construction of the new channel in reinforced concrete
State |
Completato |
Start Date |
04/02/2009 |
End Date |
30/09/2009 |
Client |
Enel S.p.A. Divisione Generazione ed Energy Management Ingegneria Civile e Idraulica Turin |
Planning Company |
Enel S.p.A. Divisione Generazione ed Energy Management Ingegneria Civile e Idraulica Turin |
Country |
ITALY, IT |
Contract |
Redoing, strengthening and maintenance of the existing channel sections for the generation of hydroelectric power of the power station at Rusià in Ceres |
Work Type |
SOA “OG1” |