Urgent works for the civil and structural restoration of the Mongiove tunnel on motorway A20 towards Palermo.
MAIN WORKS:
- Pre-treatment of surfaces in concrete – sqm 10000
- Injections of bi-component cement mortar - lt 3800
- Drilling and creation of tie-rods – ml 20168
- Strengthening of tunnels with falsework in electro-welded mesh (99000 kg) and spayed concrete Rck 35 (1200 cu m)
- Slabs in reinforced concrete-iron kg 32000 – concrete cu m 190
- Draining bituminous pavement – sqm 5016
- Coating of side walls with epoxy-acrylic polymers – sqm 4392
State |
Completato |
Start Date |
28/06/2012 |
End Date |
05/12/2012 |
Client |
Consorzio per le Autostrade Siciliane - CAS |
Planning Company |
Consorzio per le Autostrade Siciliane - CAS |
Country |
ITALY, IT |
Contract |
Urgent works for the civil and structural restoration of the Mongiove tunnel on motorway A20 towards Palermo |
Work Type |
SOA “OG4” |