Civil construction works aimed at determining the Minimum Vital Flow (Deflusso Minimo Vitale or DMV) for the new reservoir at Mori power station, near Trento.
MAIN WORKS:
- Excavation, demolition and earthwork
- Disposal of demolition waste
- Structures in reinforced concrete
- Construction of tie-rods and micro-piles
- Excavation with protections in embedment anchoring and sheet piling
- Civil constructions works regarding the power station
- Metal structural work
State |
Completato |
Start Date |
19/06/2012 |
End Date |
31/12/2013 |
Client |
Hydro Dolomiti Enel S.r.l. |
Planning Company |
Hydro Dolomiti Enel S.r.l. |
Country |
ITALIA, IT |
Contract |
Lavori civili per la realizzazione di sistema integrato per il rilascio del DMW del nuovo impianto di Mori, in provincia di Trento. |
Work Type |
SOA "OG1" |