• Login
  • Register
  • ABOUT US
    • History
    • Mission and Values
    • Company
    • Code of Ethics
    • Sostenibilità aziendale
    • Politica Aziendale GDPR
    • Documents
    • References
  • SECTORS
    • Civil and industrial buildings
    • Road Works
    • Railways works
    • Dams and Hydraulic Structures
    • Foundation and Ground Consolidation
  • WORKS
    • Civil and industiral building
    • Road Works
    • Railways Works
    • Foundations and Consolidation
    • Dams and Hydraulic Structures
  • CERTIFICATIONS
    • Professional Qualifications
    • Quality, environment, safety
    • Other Certificates
  • CONTACT
    • Where we are
    • Branch Offices
  • WORK WITH US
  • ABOUT US
    • History
    • Mission and Values
    • Company
    • Code of Ethics
    • Sostenibilità aziendale
    • Politica Aziendale GDPR
    • Documents
    • References
  • SECTORS
    • Civil and industrial buildings
    • Road Works
    • Railways works
    • Dams and Hydraulic Structures
    • Foundation and Ground Consolidation
  • WORKS
    • Civil and industiral building
    • Road Works
    • Railways Works
    • Foundations and Consolidation
    • Dams and Hydraulic Structures
  • CERTIFICATIONS
    • Professional Qualifications
    • Quality, environment, safety
    • Other Certificates
  • CONTACT
    • Where we are
    • Branch Offices
  • WORK WITH US
  • Login
  • Register
Back

New power station at Mori, Trento

Works - Works

New power station at Mori, Trento

Client:

Hydro Dolomiti Enel S.r.l.

Sector:

Works
Civil and industiral building

generate pdf datasheet
download pdf
  • Description
  • Technical datasheet
Civil construction works aimed at determining the Minimum Vital Flow (Deflusso Minimo Vitale or DMV) for the new reservoir at Mori power station, near Trento.

MAIN WORKS:

- Excavation, demolition and earthwork
- Disposal of demolition waste
- Structures in reinforced concrete
- Construction of tie-rods and micro-piles
- Excavation with protections in embedment anchoring and sheet piling
- Civil constructions works regarding the power station
- Metal structural work
State Completato
Start Date 19/06/2012
End Date 31/12/2013
Client Hydro Dolomiti Enel S.r.l.
Planning Company Hydro Dolomiti Enel S.r.l.
Country ITALIA, IT
Contract Lavori civili per la realizzazione di sistema integrato per il rilascio del DMW del nuovo impianto di Mori, in provincia di Trento.
Work Type SOA "OG1"

Description

Civil construction works aimed at determining the Minimum Vital Flow (Deflusso Minimo Vitale or DMV) for the new reservoir at Mori power station, near Trento.

MAIN WORKS:

- Excavation, demolition and earthwork
- Disposal of demolition waste
- Structures in reinforced concrete
- Construction of tie-rods and micro-piles
- Excavation with protections in embedment anchoring and sheet piling
- Civil constructions works regarding the power station
- Metal structural work

Technical datasheet

State Completato
Start Date 19/06/2012
End Date 31/12/2013
Client Hydro Dolomiti Enel S.r.l.
Planning Company Hydro Dolomiti Enel S.r.l.
Country ITALIA, IT
Contract Lavori civili per la realizzazione di sistema integrato per il rilascio del DMW del nuovo impianto di Mori, in provincia di Trento.
Work Type SOA "OG1"

Note

generate pdf datasheet
download pdf

Impresa Luigi Notari is a public company limited by shares (S.p.A.) since 1986 and holds the following certificates: UNI EN ISO 9001:2015, BS OHSAS 18001:2007 and UNI EN ISO 14001:2015 issued by ICMQ

CONTACT DETAILS
VIA FELICE CASATI, 44
20124 Milan - ITALY
PHONE: 02.66.71.29.23 r.a.
FAX: 02.66.90.925
impresa.luiginotari@impresaluiginotari.com

© 2019 IMPRESA LUIGI NOTARI spa - PIVA: 08099180153

Restricted Area

You must be registered
to download the PDF datasheet

Forgot your password?

Not registered yet? Register

Register

Enter your email address and you will receive information on how to complete your registration

Password recovery

To receive your password please enter the email address provided during the registration process