Execution of civil engineering works for the doubling of the combined cycle on the former section 5 of the Thermal Power Station at Termini Imerese (Palermo)
MAIN WORKS:
• Excavation, filling and backfilling;
• Demolitions of various constructions interfering with the new structures;
• Foundations of building and gas turbine/alternator basement;
• Sewage systems, galleries and cable conduits;
• Gas turbine/alternator building flooring;
• Civil engineering works for the installation of sea water pipeline;
• Conduits for high-voltage cables;
• Anti-acid coating;
• Roads, squares, pavements and finishing;
• Earth network;
• Civil works for fire system.
State |
Completato |
Start Date |
15/11/2005 |
End Date |
30/06/2007 |
Client |
Enel Produzione S.p.A. |
Planning Company |
Enel Produzione S.p.A. |
Country |
ITALY, IT |
Contract |
Execution of civil engineering works for the doubling of the combined cycle on the former section 5 of the Thermal Power Station at Termini Imerese (Palermo) |
Work Type |
SOA “OG1” |