Construction of underpass for pedestrians and connection ramps to the existing roads at km 649+215, replacing the level crossing at km 649+234 of the Bari – Lecce railway line in Bari.
MAIN WORKS:
- Demolition
- Installation of micropiles
- Clearance from explosive remnants of war
- Excavations and earthworks
- Reinforced concrete casting
- Monolith pushing
- Drainage and waterproofing
- Supply and installation of lifts
- Urban decor
State |
Completato |
Start Date |
28/10/2013 |
End Date |
30/10/2015 |
Client |
RFI S.p.A. - Direzione Territoriale di Bari |
Planning Company |
RFI S.p.A. - Direzione Territoriale di Bari |
Country |
ITALY, IT |
Contract |
Construction of underpass for pedestrians and connection ramps to the existing roads at km 649+215, replacing the level crossing at km 649+234 of the Bari – Lecce railway line in Bari. |
Work Type |
SOA “OG3” |