Maintenance and strengthening works for the diversion tunnel between Sillano 2 and Gramolazzo at the hydroelectric power plant of Fabbriche – town of Vagli di Sotto (Lucca)
MAIN WORKS:
- Strengthening of some sections of the canal through the demolition in rocks of the covering, insertion of metal lining and restoration with concrete
- Recovery/redoing of some areas of abutments and vaults through the application of mortar, electro-welded mesh and anchors with expansion plugs
State |
Completato |
Start Date |
19/07/2011 |
End Date |
29/11/2011 |
Client |
Enel Produzione S.p.A. – Energie Rinnovabili “UB Bologna” |
Planning Company |
Enel Produzione S.p.A. |
Country |
ITALY, IT |
Contract |
Maintenance and Strengthening of Fabbriche Power Plant |
Work Type |
SOA “OG4” |