• Login
  • Register
  • ABOUT US
    • History
    • Mission and Values
    • Company
    • Code of Ethics
    • Sostenibilità aziendale
    • Politica Aziendale GDPR
    • Documents
    • References
  • SECTORS
    • Civil and industrial buildings
    • Road Works
    • Railways works
    • Dams and Hydraulic Structures
    • Foundation and Ground Consolidation
  • WORKS
    • Civil and industiral building
    • Road Works
    • Railways Works
    • Foundations and Consolidation
    • Dams and Hydraulic Structures
  • CERTIFICATIONS
    • Professional Qualifications
    • Quality, environment, safety
    • Other Certificates
  • CONTACT
    • Where we are
    • Branch Offices
  • WORK WITH US
  • ABOUT US
    • History
    • Mission and Values
    • Company
    • Code of Ethics
    • Sostenibilità aziendale
    • Politica Aziendale GDPR
    • Documents
    • References
  • SECTORS
    • Civil and industrial buildings
    • Road Works
    • Railways works
    • Dams and Hydraulic Structures
    • Foundation and Ground Consolidation
  • WORKS
    • Civil and industiral building
    • Road Works
    • Railways Works
    • Foundations and Consolidation
    • Dams and Hydraulic Structures
  • CERTIFICATIONS
    • Professional Qualifications
    • Quality, environment, safety
    • Other Certificates
  • CONTACT
    • Where we are
    • Branch Offices
  • WORK WITH US
  • Login
  • Register
Back

Maintenance and Strengthening of Fabbriche Power Plant

Works - Works

Maintenance and Strengthening of Fabbriche Power Plant

Client:

Enel Produzione S.p.A. – Energie Rinnovabili “UB Bologna”

Sector:

Works
Dams and Hydraulic Structures
Dams and Hydraulic Structures

generate pdf datasheet
download pdf
  • Description
  • Technical datasheet
Maintenance and strengthening works for the diversion tunnel between Sillano 2 and Gramolazzo at the hydroelectric power plant of Fabbriche – town of Vagli di Sotto (Lucca)

MAIN WORKS:

- Strengthening of some sections of the canal through the demolition in rocks of the covering, insertion of metal lining and restoration with concrete
- Recovery/redoing of some areas of abutments and vaults through the application of mortar, electro-welded mesh and anchors with expansion plugs
State Completato
Start Date 19/07/2011
End Date 29/11/2011
Client Enel Produzione S.p.A. – Energie Rinnovabili “UB Bologna”
Planning Company Enel Produzione S.p.A.
Country ITALY, IT
Contract Maintenance and Strengthening of Fabbriche Power Plant
Work Type SOA “OG4”

Description

Maintenance and strengthening works for the diversion tunnel between Sillano 2 and Gramolazzo at the hydroelectric power plant of Fabbriche – town of Vagli di Sotto (Lucca)

MAIN WORKS:

- Strengthening of some sections of the canal through the demolition in rocks of the covering, insertion of metal lining and restoration with concrete
- Recovery/redoing of some areas of abutments and vaults through the application of mortar, electro-welded mesh and anchors with expansion plugs

Technical datasheet

State Completato
Start Date 19/07/2011
End Date 29/11/2011
Client Enel Produzione S.p.A. – Energie Rinnovabili “UB Bologna”
Planning Company Enel Produzione S.p.A.
Country ITALY, IT
Contract Maintenance and Strengthening of Fabbriche Power Plant
Work Type SOA “OG4”

Note

generate pdf datasheet
download pdf

Impresa Luigi Notari is a public company limited by shares (S.p.A.) since 1986 and holds the following certificates: UNI EN ISO 9001:2015, BS OHSAS 18001:2007 and UNI EN ISO 14001:2015 issued by ICMQ

CONTACT DETAILS
VIA FELICE CASATI, 44
20124 Milan - ITALY
PHONE: 02.66.71.29.23 r.a.
FAX: 02.66.90.925
impresa.luiginotari@impresaluiginotari.com

© 2019 IMPRESA LUIGI NOTARI spa - PIVA: 08099180153

Restricted Area

You must be registered
to download the PDF datasheet

Forgot your password?

Not registered yet? Register

Register

Enter your email address and you will receive information on how to complete your registration

Password recovery

To receive your password please enter the email address provided during the registration process