Hydroelectric power plant at Gerola – Dam of Pescegallo: restoration of dam with con recovery of water sealing, adjustment of freeboard, strengthening of emergency spillway and replacement of bottom spillway valves.
MAIN WORKS
- Selective open-air hydro-demolition at a pressure of 1200 bar
- Redoing of water stop on upstream face
- Waterproofing and reconstruction of upstream face through the spray application of cement mortar and fibre reinforced pre-mixed cement mortar
- Supply and installation of motor-driven valves on the button discharge
- Construction of a new footbridge in concrete and steel positioned on the top of the dam
- Modification of dam spillway with installation of new counterweight-operated shutter gate
State |
Completato |
Start Date |
16/06/2004 |
End Date |
26/10/2006 |
Client |
Enel Produzione S.p.A. |
Planning Company |
Enel S.p.A. |
Country |
ITALY, IT |
Notari's Percentage Share |
100 % |
Contract |
Hydroelectric power plant at Gerola – Dam of Pescegallo: restoration of dam with con recovery of water sealing, adjustment of freeboard, strengthening of emergency spillway and replacement of bottom spillway valves |
Work Type |
SOA “OG5” |