• Login
  • Register
  • ABOUT US
    • History
    • Mission and Values
    • Company
    • Code of Ethics
    • Sostenibilità aziendale
    • Politica Aziendale GDPR
    • Documents
    • References
  • SECTORS
    • Civil and industrial buildings
    • Road Works
    • Railways works
    • Dams and Hydraulic Structures
    • Foundation and Ground Consolidation
  • WORKS
    • Civil and industiral building
    • Road Works
    • Railways Works
    • Foundations and Consolidation
    • Dams and Hydraulic Structures
  • CERTIFICATIONS
    • Professional Qualifications
    • Quality, environment, safety
    • Other Certificates
  • CONTACT
    • Where we are
    • Branch Offices
  • WORK WITH US
  • ABOUT US
    • History
    • Mission and Values
    • Company
    • Code of Ethics
    • Sostenibilità aziendale
    • Politica Aziendale GDPR
    • Documents
    • References
  • SECTORS
    • Civil and industrial buildings
    • Road Works
    • Railways works
    • Dams and Hydraulic Structures
    • Foundation and Ground Consolidation
  • WORKS
    • Civil and industiral building
    • Road Works
    • Railways Works
    • Foundations and Consolidation
    • Dams and Hydraulic Structures
  • CERTIFICATIONS
    • Professional Qualifications
    • Quality, environment, safety
    • Other Certificates
  • CONTACT
    • Where we are
    • Branch Offices
  • WORK WITH US
  • Login
  • Register
Back

Monte Olimpino Tunnel

Works - Works

Monte Olimpino Tunnel

Client:

RFI S.p.A. Rete Ferroviaria Italiana Via Breda, 28 - 20126 Milan

Sector:

Works
Railways Works

generate pdf datasheet
download pdf
  • Description
  • Technical datasheet
Development of drawings, measurements, etc. and execution of works for the reactivation of the Monte Olimpino Tunnel 2 between km 3+258 and 4+053 along the Milano – Chiasso railway line.

MAIN WORKS:

Complete restoration of the two-track railway tunnel of Monte Olimpino 2. Works can be divided into two macro-groups. The first macro-group concerned the re-profiling and waterproofing of the tunnel, including the consolidation of side walls through their hydro-demolition and successive lining. Then, the tunnel was consolidated in the connection point between the tunnel invert/side walls through cement and resin grouting. Later, the invert tunnel was lowered through milling. Moreover, tie-rods and consolidation micro-piles were created. Lastly, works were completed with the total redoing of the entire profile of the tunnel, by casting the invert tunnel and then the side walls and the arch thanks to mobile formwork specifically designed for the project. We dealt with the waterproofing of the tunnel with double membrane in polyolefin with vacuum injection system.

The second macro-group of works concerned, instead, the adjustment of the inner profile of the tunnel following a major sagging. Therefore, the entire section was demolished through the traditional mechanical excavation, followed by the installation of steel ribs and lastly by the creation of the covering through concrete casting.

Some of these works (consolidation and hydro-demolition, cutting and installation of reticular steel ribs) and the finishing works (installation of cable runs in reinforced concrete, cable installation, temporary lightning removal, permanent lightning installation) were done on the two-track section during railway traffic (out of hours).
State Completato
Start Date 18/06/2007
End Date 30/04/2012
Client RFI S.p.A. Rete Ferroviaria Italiana Via Breda, 28 - 20126 Milan
Planning Company SWS Engineering
Country ITALY, IT
Name and Composition of Consortium Impresa Luigi Notari S.p.A (agent) - Ivecos S.p.A. - Mga S.r.l.
Notari's Percentage Share 60%
Contract Development of drawings, measurements, etc. and execution of works for the reactivation of the Monte Olimpino Tunnel between km 3+258 and 4+053 along the Milano – Chiasso railway line
Work Type SOA "OG4"

Description

Development of drawings, measurements, etc. and execution of works for the reactivation of the Monte Olimpino Tunnel 2 between km 3+258 and 4+053 along the Milano – Chiasso railway line.

MAIN WORKS:

Complete restoration of the two-track railway tunnel of Monte Olimpino 2. Works can be divided into two macro-groups. The first macro-group concerned the re-profiling and waterproofing of the tunnel, including the consolidation of side walls through their hydro-demolition and successive lining. Then, the tunnel was consolidated in the connection point between the tunnel invert/side walls through cement and resin grouting. Later, the invert tunnel was lowered through milling. Moreover, tie-rods and consolidation micro-piles were created. Lastly, works were completed with the total redoing of the entire profile of the tunnel, by casting the invert tunnel and then the side walls and the arch thanks to mobile formwork specifically designed for the project. We dealt with the waterproofing of the tunnel with double membrane in polyolefin with vacuum injection system.

The second macro-group of works concerned, instead, the adjustment of the inner profile of the tunnel following a major sagging. Therefore, the entire section was demolished through the traditional mechanical excavation, followed by the installation of steel ribs and lastly by the creation of the covering through concrete casting.

Some of these works (consolidation and hydro-demolition, cutting and installation of reticular steel ribs) and the finishing works (installation of cable runs in reinforced concrete, cable installation, temporary lightning removal, permanent lightning installation) were done on the two-track section during railway traffic (out of hours).

Technical datasheet

State Completato
Start Date 18/06/2007
End Date 30/04/2012
Client RFI S.p.A. Rete Ferroviaria Italiana Via Breda, 28 - 20126 Milan
Planning Company SWS Engineering
Country ITALY, IT
Name and Composition of Consortium Impresa Luigi Notari S.p.A (agent) - Ivecos S.p.A. - Mga S.r.l.
Notari's Percentage Share 60%
Contract Development of drawings, measurements, etc. and execution of works for the reactivation of the Monte Olimpino Tunnel between km 3+258 and 4+053 along the Milano – Chiasso railway line
Work Type SOA "OG4"

Note

generate pdf datasheet
download pdf

Impresa Luigi Notari is a public company limited by shares (S.p.A.) since 1986 and holds the following certificates: UNI EN ISO 9001:2015, BS OHSAS 18001:2007 and UNI EN ISO 14001:2015 issued by ICMQ

CONTACT DETAILS
VIA FELICE CASATI, 44
20124 Milan - ITALY
PHONE: 02.66.71.29.23 r.a.
FAX: 02.66.90.925
impresa.luiginotari@impresaluiginotari.com

© 2019 IMPRESA LUIGI NOTARI spa - PIVA: 08099180153

Restricted Area

You must be registered
to download the PDF datasheet

Forgot your password?

Not registered yet? Register

Register

Enter your email address and you will receive information on how to complete your registration

Password recovery

To receive your password please enter the email address provided during the registration process