Strengthening Works on the Andonno Power Plant
Enel Divisione GEM - Area di Business Energie Rinnovabili “Unità di Cuneo”
Works
Dams and Hydraulic Structures
Dams and Hydraulic Structures
State | Completato |
---|---|
Start Date | 12/03/2008 |
End Date | 29/05/2009 |
Client | Enel Divisione GEM - Area di Business Energie Rinnovabili “Unità di Cuneo” |
Planning Company | Enel S.p.A. |
Country | ITALY, IT |
Name and Composition of Consortium | ATB S.p.A - Impresa Luigi Notari S.p.A. - Camuna Installazioni S.p.A. |
Notari's Percentage Share | 36.25 % |
Contract | Works for the application of metal covering, waterproofing and strengthening of surfaces of the pressure pipelines of the power station at Andonno (CN). |
Work Type | SOA “OG6” |
State | Completato |
---|---|
Start Date | 12/03/2008 |
End Date | 29/05/2009 |
Client | Enel Divisione GEM - Area di Business Energie Rinnovabili “Unità di Cuneo” |
Planning Company | Enel S.p.A. |
Country | ITALY, IT |
Name and Composition of Consortium | ATB S.p.A - Impresa Luigi Notari S.p.A. - Camuna Installazioni S.p.A. |
Notari's Percentage Share | 36.25 % |
Contract | Works for the application of metal covering, waterproofing and strengthening of surfaces of the pressure pipelines of the power station at Andonno (CN). |