Strengthening Works on the Andonno Power Plant
Enel Divisione GEM - Area di Business Energie Rinnovabili “Unità di Cuneo”
Dams and Hydraulic Structures
Dams and Hydraulic Structures
Works
| State | Completato |
|---|---|
| Start Date | 12/03/2008 |
| End Date | 29/05/2009 |
| Client | Enel Divisione GEM - Area di Business Energie Rinnovabili “Unità di Cuneo” |
| Planning Company | Enel S.p.A. |
| Country | ITALY, IT |
| Name and Composition of Consortium | ATB S.p.A - Impresa Luigi Notari S.p.A. - Camuna Installazioni S.p.A. |
| Notari's Percentage Share | 36.25 % |
| Contract | Works for the application of metal covering, waterproofing and strengthening of surfaces of the pressure pipelines of the power station at Andonno (CN). |
| Work Type | SOA “OG6” |
| State | Completato |
|---|---|
| Start Date | 12/03/2008 |
| End Date | 29/05/2009 |
| Client | Enel Divisione GEM - Area di Business Energie Rinnovabili “Unità di Cuneo” |
| Planning Company | Enel S.p.A. |
| Country | ITALY, IT |
| Name and Composition of Consortium | ATB S.p.A - Impresa Luigi Notari S.p.A. - Camuna Installazioni S.p.A. |
| Notari's Percentage Share | 36.25 % |
| Contract | Works for the application of metal covering, waterproofing and strengthening of surfaces of the pressure pipelines of the power station at Andonno (CN). |
| Work Type | SOA “OG6” |