Redoing of free surface diversion channel in the Troina-Grottafumata tunnel section at the hydroelectric power station at Troina.
MAIN WORKS:
- Creation of access trails
- Demolition and reconstruction of partitions in reinforced concrete
- Strengthening of sections of covering and side walls: laying of steel ribs, arch-welded fencing, smoothed and float-finished sprayed concrete
- Injections into reinforcement points and complete redoing of existing sections
- Installation of lighting, voice and emergency system
| State |
Completato |
| Start Date |
30/10/2009 |
| End Date |
31/10/2011 |
| Client |
Enel Servizi S.r.l. Divisione Generazione ed Energy Management |
| Planning Company |
Enel S.p.A. Area Di Business e Generazione Progetti Imp. Idroelettrici |
| Country |
ITALY, IT |
| Contract |
Redoing of free surface diversion channel in the Troina-Grottafumata tunnel section at the hydroelectric power station at Troina |
| Work Type |
SOA “OG4” |