Civil engineering works for the redoing of the diverting channel of the Rusià power plant.
MAIN WORKS:
• Micro-piles
• Tie-rods
• Concrete casting and plastering
• Excavations and earthworks
State |
Completato |
Start Date |
02/11/2005 |
End Date |
11/04/2006 |
Client |
Enel Green Power S.p.A. – Area Italia Europa “U.B. Domodossola” |
Planning Company |
Enel Green Power S.p.A. |
Country |
ITALY, IT |
Contract |
Civil engineering works for the redoing of the diverting channel of the Rusià power plant |
Work Type |
SOA “OG8” |