Civil and mechanical engineering works for the construction of a new subsidiary spillway at the dam of Rimasco – Fervento power plant (Vicenza)
MAIN WORKS:
- Earthworks: 65,000 cu. m
- Excavations with the use of explosive: 700 cu. m.
- Rock excavation to widen spillway tunnel using explosive: 850 cu. m.
- Covering and strengthening of walls inside tunnels (steel ribs: 12t ca. and covering in reinforced concrete: 300000 cu. m.)
- Supply and installation of plane and sliding metal sluice shutters
- Construction of structures in reinforced concrete (Outlet tower 340000 cu. m. of reinforced concrete)
- Construction of building for sluice shutters control
State |
Completato |
Start Date |
05/12/2013 |
End Date |
18/05/2016 |
Client |
Enel Green Power S.p.A. – Italy and Europe |
Planning Company |
Enel Green Power S.p.A. – Italy and Europe |
Country |
ITALY, IT |
Contract |
Civil and mechanical engineering works for the construction of a new subsidiary spillway at the dam of Rimasco – Fervento power plant (Vicenza) |
Work Type |
SOA "OG4" |